Ive done a succesfull switch about 3 months ago (to play around with the software). I was wondering if there was a way to updqate to the newest posts and everything. Also, im wondering where i could make this into coppermine>SM>mabmo comanation. I already have coppermine phpbb and simple machines installed on the same database.
Thanks
I'm afraid you'll need to do a complete reconvert to get new posts.
As for Mambo, if you had phpBB integrated with it this may cause problems with the integration of SMF because it modifies Mambo's database.
-[Unknown]
No, my mambo isnt even really set up at all. only think sharing the databse is phpbb, SM, and coppermine. The "updating posts" part was more of a "can i over write the tables with the same script that transfered phpbb to SM" to update the posts?
i just dont want to triple the database size....
Quote from: richards on February 05, 2005, 02:35:17 AM
i just dont want to triple the database size....
No, no, it's fine. The tool empties the SMF installation first anyway.
-[Unknown]